
On March 31st, 2025, as the benchmark ship type, a new generation of Heavy Load Carrier in the world, 15600DWT new Heavy Load Carrier named "ROTRA FUTURA" was completed construction in our company, delivered to the Europe Shipowner, and smoothly sailed out from shipyard. With its super-large loading capacity, intelligent loading system and green and low-carbon technology, the ship is to perfectly match up the needs of the next generation of ultra-large offshore wind power equipment transportation, and its advents will promote the upgrading of global offshore wind power transportation’s equipment.
The first innovation of 1,500-ton class heavy-duty Stern Ramp and spud pole system on this ship, to equip with three Liebherr cranes, enables efficient loading and unloading of giant wind power components at a jetty with limited conditions. Its original multi-layer loading technology of gantry frame realizes flexible loading of multi-categories cargoes on a single voyage and greatly improves transportation’s efficiency. At the same time, the ship adopts the combination of hydrodynamic optimization and Wartsila intelligent propulsion system, and the fresh water heat recovery technology of the main engine, achieving a breakthrough of energy consumption and carbon emissions both of them cutting off by 15%, and taking the lead in meeting the highest environmental protection standards of IMO Tier III.